Electricity modelling

Mandatory

Required: must be met for the credential.

Superseded

The document this clause was read from is superseded. It is kept so older citations resolve.

Klar Cite summary

This clause concerns electricity modelling. An independent verifier checks the declaration before it is published. This is possibly linked to climate.

International EPD System·clause not recorded·p.22

Climate Health · Human Health · Circular Economy · Ecosystem Health

Original wording

The publisher lets each reader see 15 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

Details

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Check suppliers or materials — verify suppliers, documents or substances against a list or rule
Standing
Required — must be met for the credential
Topic
Climate Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Also relevant to
Human Health, Circular Economy, Ecosystem Health — other topics the clause addresses

Cite this clause

International EPD System · PCR 2019:14 Construction products · version v1.3.4 · clause not recorded · page 22 · build 2026-10-27-1239 · https://klarcite.com/r/e18ac9288ed36827

Source document

Record details

Page 22, 4.8.1 ELECTRICITY MODELLING. Read in build 2026-10-27-1239, harvested 2026-10-27.

uid e18ac9288ed36827 · document 519fc75af292387d · fidelity verbatim · published 2024-04-30

See all clauses in this standard