International EPD System
Held and in scopeThe International EPD System (EPD International AB)
the General Programme Instructions v5.0.1 and PCR 2019:14 Construction products (v2.0.1 current; v2.0.0, v1.3.4 and v1.11 superseded) are held as rules; complementary PCRs, ECO Platform's own rules and individual product declarations (EPDs themselves) are not
Profile
- Operator: EPD International AB
- Market side: supply
- Self-description: "This document, including its annexes, constitutes the General Programme Instructions (GPI) of the International EPD System." — quoted from its own General Programme Instructions v5.0.1, p4
- Site: www.environdec.comPermanent address on this site: /schemes/international-epd-system — it does not change between builds, so it is safe to cite or bookmark.
- What to know: Layers 04 and 02 of the EPD governing hierarchy: the programme instructions and the construction PCR. Nine documents held, four PCR versions coexisting deliberately, plus four self-contained c-PCRs.
Authored profile, compiled 2026-08-27. Every self-description is quoted from the body's own website or its own published document, with the source against the quote.
- Operator
- EPD International AB
- Requirements held
- 629
- Documents held
- 9
- Market side
- Supply
- Namespace
- schemes
Standards held
| Standard | Version | Status | Published | Requirements |
|---|---|---|---|---|
| c-PCR-013 Prefabricated buildings intended as special-purpose transportable units | 1.0.0 | current | 2025-04-14 | 15 of 31 held |
| c-PCR-014 Acoustical ceiling and wall solutions | 1.0.1 | current | 2026-07-02 | 7 of 8 held |
| c-PCR-021 Furniture and components of furniture | 2.0.1 | current | 2025-04-22 | 3 of 7 held |
| c-PCR-029 Buildings | 1.0.0 | current | 2025-04-23 | 12 of 26 held |
| General Programme Instructions | v5.0.1 | current | 2025-02-27 | 162 of 192 held |
| PCR 2019:14 Construction products | v1.3.4 | superseded | 2024-04-30 | 62 of 73 held |
| PCR 2019:14 Construction products | v1.11 | superseded | 2021-02-05 | 27 of 37 held |
| PCR 2019:14 Construction products | v2.0.0 | superseded | 2025-04-07 | 82 of 97 held |
| PCR 2019:14 Construction products | v2.0.1 | current | 2025-06-05 | 143 of 158 held |
Requirements counts the clauses in the product view. Where a standard holds more, the rest fall on a service, a company or a project rather than on a product.
Recognition
No recognition of this scheme is recorded in this build. That is not a statement that nobody recognises it.
Read the 629 requirements held for International EPD System
Counts on this page are generated from build 2026-10-05-0439.