No Lost Time Injuries (LTI) during the last three years

Klar Cite summary

This clause concerns lost time injury record of the plant. Optional; earns points. An independent assessor checks it. This concerns people and fair work.

Concrete Sustainability Council·clause S3.10·p.63

The publisher’s words

CSC Technical Manual (Precast Concrete with own fresh concrete production) clause S3.10 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How to read this clause

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
Required?
Optional, earns points — not required; meeting it adds to the score
Topic
Social Health & Equity — the topic the clause addresses, grouped by the Common Materials Framework (CMF)

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Precast Concrete with own fresh concrete production) · version v3.0 · clause S3.10 · page 63 · build 2026-10-16-0230 · https://klarcite.com/r/9db8137781486fb0

Source document

Record details

Page 63. Read in build 2026-10-16-0230, harvested 2026-10-16.

uid 9db8137781486fb0 · document 7156fa3745c18186 · fidelity verbatim · published 2025-07-01

Other clauses in this standard