Respect for property rights
Concrete Sustainability Council·clause B2.05·p.74
The requirement
CSC Technical Manual (Precast Concrete with own fresh concrete production) clause B2.05 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- Concrete
How it is proven
- Evidence required
- A policy or statement addressing the respect of property rights.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Social Health & Equity — the CMF area the clause addresses
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Precast Concrete with own fresh concrete production) · version v3.0 · clause B2.05 · page 74 · build 2026-10-05-0439 · https://klarcite.com/r/baa271f91e1ba955
Record details
Page 74, B2.05 Respect for property rights. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid baa271f91e1ba955 · document 7156fa3745c18186 · published 2025-07-01