Electricity from the grid modelling

Mandatory

Required: must be met for the credential.

Klar Cite summary

Grid electricity must be modelled market-based; contractual instruments used must be unique, tracked, cancelled, local and documented for the verifier. An independent verifier checks the declaration before it is published. This relates mainly to climate.

International EPD System·clause 4.7.2.3·pp.33-34

Climate Health

Original wording

The publisher lets each reader see 20 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

Details

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Provide information — e.g. declare ingredients or publish an environmental product declaration
Standing
Required — must be met for the credential
Topic
Climate Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)

Cite this clause

International EPD System · PCR 2019:14 Construction products · version v2.0.1 · clause 4.7.2.3 · page 33-34 · build 2026-10-27-1239 · https://klarcite.com/r/7e74975b52a589bb

Source document

Record details

Page 33-34, 4.7.2.3 Electricity from the grid. Read in build 2026-10-27-1239, harvested 2026-10-27.

uid 7e74975b52a589bb · document 6707bcdc3929e82f · fidelity verbatim · published 2025-06-05

See all clauses in this standard