Electricity from the grid modelling
Mandatory
Required: must be met for the credential.
Klar Cite summary
Grid electricity must be modelled market-based; contractual instruments used must be unique, tracked, cancelled, local and documented for the verifier. An independent verifier checks the declaration before it is published. This relates mainly to climate.
International EPD System·clause 4.7.2.3·pp.33-34
Climate Health
Original wording
The publisher lets each reader see 20 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
Details
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
Klar Cite’s reading
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Provide information — e.g. declare ingredients or publish an environmental product declaration
- Standing
- Required — must be met for the credential
- Topic
- Climate Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Cite this clause
International EPD System · PCR 2019:14 Construction products · version v2.0.1 · clause 4.7.2.3 · page 33-34 · build 2026-10-27-1239 · https://klarcite.com/r/7e74975b52a589bb
Record details
Page 33-34, 4.7.2.3 Electricity from the grid. Read in build 2026-10-27-1239, harvested 2026-10-27.
uid 7e74975b52a589bb · document 6707bcdc3929e82f · fidelity verbatim · published 2025-06-05