PCR stakeholder consultation group
Mandatory
Required: must be met for the credential.
Klar Cite summary
This clause is about how International EPD System runs its scheme — product category rules stakeholder consultation group — not a requirement on the product itself.
International EPD System·clause 4.3.4·p.12
Original wording
The publisher lets each reader see 20 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
Details
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
Klar Cite’s reading
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Other — the reading did not fit these types
- Standing
- Required — must be met for the credential
Cite this clause
International EPD System · General Programme Instructions · version v5.0.1 · clause 4.3.4 · page 12 · build 2026-10-27-1239 · https://klarcite.com/r/6059385533d0effd
Record details
Page 12, 4.3.4 PCR STAKEHOLDER CONSULTATION GROUP. Read in build 2026-10-27-1239, harvested 2026-10-27.
uid 6059385533d0effd · document bb5a17f2dcfd96ba · fidelity verbatim · published 2025-02-27