ALLOCATION RULES

Mandatory

Required: must be met for the credential.

Klar Cite summary

Outputs failing any end-of-waste criterion are allocated as waste, otherwise as co-products; use-stage and end-of-life outputs count first as waste.

International EPD System·clause 4.5·pp.21-22

Circular Economy · Climate Health

Original wording

The publisher lets each reader see 20 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

Details

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Other — the reading did not fit these types
Standing
Required — must be met for the credential
Topic
Circular Economy — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Also relevant to
Climate Health — other topics the clause addresses
Refers to
Annex 4 — places elsewhere in the document

Cite this clause

International EPD System · PCR 2019:14 Construction products · version v2.0.1 · clause 4.5 · page 21-22 · build 2026-10-27-1239 · https://klarcite.com/r/2dddb990f66aa4f6

Source document

Record details

Page 21-22, 4.5 ALLOCATION RULES. Read in build 2026-10-27-1239, harvested 2026-10-27.

uid 2dddb990f66aa4f6 · document 6707bcdc3929e82f · fidelity verbatim · published 2025-06-05

See all clauses in this standard