ALLOCATION RULES
Mandatory
Required: must be met for the credential.
Klar Cite summary
Outputs failing any end-of-waste criterion are allocated as waste, otherwise as co-products; use-stage and end-of-life outputs count first as waste.
International EPD System·clause 4.5·pp.21-22
Circular Economy · Climate Health
Original wording
The publisher lets each reader see 20 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
Details
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
Klar Cite’s reading
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Other — the reading did not fit these types
- Standing
- Required — must be met for the credential
- Topic
- Circular Economy — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
- Also relevant to
- Climate Health — other topics the clause addresses
- Refers to
- Annex 4 — places elsewhere in the document
Cite this clause
International EPD System · PCR 2019:14 Construction products · version v2.0.1 · clause 4.5 · page 21-22 · build 2026-10-27-1239 · https://klarcite.com/r/2dddb990f66aa4f6
Record details
Page 21-22, 4.5 ALLOCATION RULES. Read in build 2026-10-27-1239, harvested 2026-10-27.
uid 2dddb990f66aa4f6 · document 6707bcdc3929e82f · fidelity verbatim · published 2025-06-05