Project independence review

Klar Cite’s name
Mandatory

Required: must be met for the credential.

Guidance

This is guidance, not a requirement. Green Star Buildings Submission Guidelines restates what Green Star’s standard requires; the register holds it and cites it, and does not count it as a requirement or show it as one.

Superseded

The document this clause was read from is superseded. It is kept so older citations resolve.

Green Star·clause not recorded·p.192

Level
Credit Achievement

Original wording

Green Star Buildings Submission Guidelines — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: unbiased project evaluation

written by a model, checked against the clause

Read it at the source

Details

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Have a system in place — e.g. a management system, a procedure or a take-back scheme
Standing
Required — must be met for the credential
Level
Credit Achievement — the level of the credential this clause belongs to
Option
Option INDEPENDENT DESIGN REVIE — the document offers alternatives, and this is one

Cite this clause

Green Star · Green Star Buildings Submission Guidelines · version v1 Rev C · clause not recorded · page 192 · build 2026-10-27-1239 · https://klarcite.com/r/f6fe5cae4f9f8272

Source document

Record details

Page 192. Read in build 2026-10-27-1239, harvested 2026-10-27.

uid f6fe5cae4f9f8272 · document 51b013d0b927654f · fidelity condensed · published 2023-10