Transport management system

Klar Cite summary

The site must have transport management system in place. It is needed for the silver level. It applies to cement. Evidence the scheme asks for: extract of the transportation management system. This is possibly linked to climate.

Concrete Sustainability Council·clause E8.02·p.45

The publisher’s words

CSC Technical Manual (Slag Grinding) clause E8.02 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
Cement

How it is proven

Evidence required
1. Extract of the transportation management system (or logistical disposition system) showing that it contains the required items.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How to read this clause

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Have a system in place — e.g. a management system, a procedure or a take-back scheme
Required?
Yes, from Silver up — below Silver it earns points
Topic
Climate Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Level
Silver — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Slag Grinding) · version v3.0 · clause E8.02 · page 45 · build 2026-10-16-0230 · https://klarcite.com/r/f1de2449e76f6b4d

Source document

Record details

Page 45, E8 - Transport. Read in build 2026-10-16-0230, harvested 2026-10-16.

uid f1de2449e76f6b4d · document 137925db5c270170 · fidelity verbatim · published 2025-12-01