Free, prior and informed consent
Klar Cite summary
This clause concerns free, prior and informed consent. It is needed for the bronze level. Evidence the scheme asks for: documentation of the process according FPIC or similar and its outcomes; reference to evidence for P3.01. This concerns people and fair work.
Concrete Sustainability Council·clause P3.02·p.12
The publisher’s words
CSC Technical Manual (Slag Grinding) clause P3.02 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- 1. Documentation of the process according FPIC or similar (see the annex) and its outcomes OR Reference to evidence for P3.01 (in case no indigenous people are potentially affected)
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How to read this clause
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Have a system in place — e.g. a management system, a procedure or a take-back scheme
- Required?
- Yes — required at every certification level
- Topic
- Social Health & Equity — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
- Level
- Bronze — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Slag Grinding) · version v3.0 · clause P3.02 · page 12 · build 2026-10-16-0230 · https://klarcite.com/r/ef0f1d8007d0e9ce
Record details
Page 12. Read in build 2026-10-16-0230, harvested 2026-10-16.
uid ef0f1d8007d0e9ce · document 137925db5c270170 · fidelity verbatim · published 2025-12-01