Handling of waste and production waste
Mandatory
Required: must be met for the credential.
Klar Cite summary
The manufacturer must sort production waste at source, keep a waste plan covering fractions, reduction and treatment, and send no production waste to landfill.
Nordic Swan·clause O39·pp.42-43
Circular Economy
Original wording
The publisher lets each reader see 10 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
Details
How it is proven
- Evidence required
- Waste handling plan featuring waste fractions, initiatives taken and how the waste fraction is dealt with. Alternatively, an ISO 14001 certificate for the manufacturing plant and an Eco-Management and Audit Scheme (EMAS) certificate for the company can be sent to show compliance with this requirement.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
Klar Cite’s reading
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
- Standing
- Required — must be met for the credential
- Topic
- Circular Economy — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Cite this clause
Nordic Swan · Floor Coverings (029) · version Group 029 v7.3 · clause O39 · page 42-43 · build 2026-10-27-1239 · https://klarcite.com/r/eb4ef8a2fb1a4bd8
Record details
Page 42-43, 1.5.4 Energy and Waste. Read in build 2026-10-27-1239, harvested 2026-10-27.
uid eb4ef8a2fb1a4bd8 · document 80398fbdf4e8f5cb · fidelity verbatim · publication date not recorded