Daylight exposure in occupied areas

Klar Cite’s name
Mandatory

Required: must be met for the credential.

Guidance

This is guidance, not a requirement. Green Star Buildings Submission Guidelines restates what Green Star’s standard requires; the register holds it and cites it, and does not count it as a requirement or show it as one.

Superseded

The document this clause was read from is superseded. It is kept so older citations resolve.

Green Star·clause Credit: 9·p.90

Human Health

Level
Credit Achievement

Original wording

Green Star Buildings Submission Guidelines clause Credit: 9 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: daylight levels in building spaces

written by a model, checked against the clause

Read it at the source

Details

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
Standing
Required — must be met for the credential
Topic
Human Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Level
Credit Achievement — the level of the credential this clause belongs to

Cite this clause

Green Star · Green Star Buildings Submission Guidelines · version v1 Rev C · clause Credit: 9 · page 90 · build 2026-10-27-1239 · https://klarcite.com/r/c4b647955f4cd284

Source document

Record details

Page 90. Read in build 2026-10-27-1239, harvested 2026-10-27.

uid c4b647955f4cd284 · document 51b013d0b927654f · fidelity verbatim · published 2023-10