The document this clause was read from is superseded. It is kept so older citations resolve.

Transport management system

Klar Cite summary

This clause concerns transport management system. It is needed for the silver level. Evidence the scheme asks for: extract of the transportation management system. This is possibly linked to climate.

Concrete Sustainability Council·clause E8.02·p.102

The publisher’s words

CSC Technical Manual clause E8.02 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Extract of the transportation management system (or logistical disposition system) showing that it contains the required items.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How to read this clause

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Provide information — e.g. declare ingredients or publish an environmental product declaration
Required?
Yes, from Silver up — below Silver it earns points
Topic
Climate Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Level
Silver — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual · version v2.1 · clause E8.02 · page 102 · build 2026-10-16-0230 · https://klarcite.com/r/8ef92eac81baf4ff

Source document

Record details

Page 102. Read in build 2026-10-16-0230, harvested 2026-10-16.

uid 8ef92eac81baf4ff · document 1a9857eb57c8253e · fidelity verbatim · published 2021-11-22

Other clauses in this standard