The document this clause was read from is superseded. It is kept so older citations resolve.
Certificate Validity and Withdrawal
Concrete Sustainability Council·clause 1.8·p.20
The requirement
CSC Technical Manual clause 1.8 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
Cite this clause
Concrete Sustainability Council · CSC Technical Manual · version v2.1 · clause 1.8 · page 20 · build 2026-10-05-0439 · https://klarcite.com/r/22a3fd16f986c66f
Record details
Page 20, Certificate Validity and Withdrawal. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 22a3fd16f986c66f · document 1a9857eb57c8253e · fidelity verbatim · published 2021-11-22
Other clauses in this standard
| Clause | Name |
|---|---|
| 1.7 | Use of CSC Logo |
| 1.9 | Grievance Procedure |
| 3.4 | Traceability Framework |
| B1.01 | Local Economy |
| B2.01 | Ethical risk assessment |
| B2.02 | Policy or code for ethical business |