Energy consumption - cement-based panels

Mandatory

Required: must be met for the credential.

Klar Cite summary

Producing fibre cement flat sheets must use no more than 2 MJ/kg of panel in gate-to-gate electricity and heat, cement manufacture and transport excluded. This concerns climate.

Nordic Swan·clause O49·p.40

Climate Health

Limit
≤ 2 MJ/kg

Original wording

The publisher lets each reader see 11 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

Details

What the product must meet

Limits held for this clause

Parameter / contextOperatorLimitUnit
Energy useenergy intensity≤2MJ/kg

Compare this limit across schemes

The limit was read from the clause wording.

How it is proven

Evidence required
Calculation showing compliance with the requirement. The calculation must contain information about the quantity of panels produced, electricity and fuel consumed, and which fuel sources have been used.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
Standing
Required — must be met for the credential
Topic
Climate Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)

Cite this clause

Nordic Swan · Exterior Panels And Cladding (114) · version Group 114 v2.1 · clause O49 · page 40 · build 2026-10-27-1239 · https://klarcite.com/r/74cbb77e78565c64

Source document

Record details

Page 40. Read in build 2026-10-27-1239, harvested 2026-10-27.

uid 74cbb77e78565c64 · document a6ebfe6864a46308 · fidelity verbatim · publication date not recorded

See all clauses in this standard