When verification takes place

Klar Cite’s name
Mandatory

Required: must be met for the credential.

Product Carbon Footprint·clause 5.5.1·p.78

Original wording

PACT Methodology for calculating and exchanging cradle-to-gate PCFs clause 5.5.1 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: the timing of verification, after a result is calculated and before it is shared through the network, and the company's responsibility for starting early.

written by a model, checked against the clause

Read it at the source

Details

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Check suppliers or materials — verify suppliers, documents or substances against a list or rule
Standing
Required — must be met for the credential

Cite this clause

Product Carbon Footprint · PACT Methodology for calculating and exchanging cradle-to-gate PCFs · version v3.0 · clause 5.5.1 · page 78 · build 2026-10-27-1239 · https://klarcite.com/r/713e0ab88635c4ad

Source document

Record details

Page 78. Read in build 2026-10-27-1239, harvested 2026-10-27.

uid 713e0ab88635c4ad · document 1a80c1c5baa0cfd0 · fidelity close quote · publication date not recorded

See all clauses in this standard