Provision for site closure
Klar Cite’s nameMandatory
Required: must be met for the credential.
CARES Sustainable Constructional Steel·clause 2.11·p.14
Social Health & Equity
This credential is recognised by BREEAM Mat 03 Responsible sourcing of construction products.
Original wording
CARES Sustainable Constructional Steel Scheme Manual clause 2.11 — words not shown. Read it at the source. No notice of terms was found in the document. Silence is not permission, so the words are not republished here.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: arrangements for staff and local communities if a site closes or is decommissioned.
written by a model, checked against the clause
Details
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
Klar Cite’s reading
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Have a system in place — e.g. a management system, a procedure or a take-back scheme
- Standing
- Required — must be met for the credential
- Topic
- Social Health & Equity — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Cite this clause
CARES Sustainable Constructional Steel · CARES Sustainable Constructional Steel Scheme Manual · version V10 · clause 2.11 · page 14 · build 2026-10-27-1239 · https://klarcite.com/r/6629b94f87aee0ff
Record details
Page 14. Read in build 2026-10-27-1239, harvested 2026-10-27.
uid 6629b94f87aee0ff · document 81efcd5749f1437d · published 2026-06-01