Appointment of independent commissioning agent
Klar Cite’s nameMandatory
Required: must be met for the credential.
Guidance
This is guidance, not a requirement. Green Star Buildings Submission Guidelines restates what Green Star’s standard requires; the register holds it and cites it, and does not count it as a requirement or show it as one.
Green Star·clause 3.16·p.55
- Level
- Credit Achievement
Original wording
Green Star Buildings Submission Guidelines clause 3.16 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: appointment of ICA prior to design development
written by a model, checked against the clause
Details
How it is proven
- Who checks it
- Applicant declares — a signed statement from the applicant
Klar Cite’s reading
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
- Standing
- Required — must be met for the credential
- Level
- Credit Achievement — the level of the credential this clause belongs to
Cite this clause
Green Star · Green Star Buildings Submission Guidelines · version v1.1 Rev A · clause 3.16 · page 55 · build 2026-10-27-1239 · https://klarcite.com/r/554dd58d94b23a23
Record details
Page 55. Read in build 2026-10-27-1239, harvested 2026-10-27.
uid 554dd58d94b23a23 · document b6cffefd9806e9f5 · published 2025-10