Foam

Mandatory

Required: must be met for the credential.

Klar Cite summary

Plants making virgin plastic or rubber foam for carpets must cut COD in effluent to water by 90%, by treatment at the plant or elsewhere. Evidence the scheme asks for: description of how the COD effluents from foam production is treated and how COD effluents are measured and monitored. + Test report. An independent assessor checks it. This concerns ecosystems and nature.

Nordic Swan·clause O12·p.16

Ecosystem Health

Original wording

The publisher lets each reader see 7 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

Details

How it is proven

Evidence required
+ Description of how the COD effluents from foam production is treated and how COD effluents are measured and monitored. + Test report showing that the limit value for COD is fulfilled.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
Standing
Required — must be met for the credential
Topic
Ecosystem Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)

Cite this clause

Nordic Swan · Textile Floor Coverings And Carpets (113) · version Group 113 v2.0 · clause O12 · page 16 · build 2026-10-27-1239 · https://klarcite.com/r/453ba9610bb7ede8

Source document

Record details

Page 16, 4.2 Material requirements. Read in build 2026-10-27-1239, harvested 2026-10-27.

uid 453ba9610bb7ede8 · document 27120c6b668bae11 · fidelity verbatim · publication date not recorded

See all clauses in this standard