Implementation of the noise/vibration management plan

Klar Cite summary

This clause concerns implementation of the noise/vibration management plan. It is needed for the gold level. Evidence the scheme asks for: concrete; evidence of the measures taken, e.g. photos; cement, aggregates. This relates mainly to people and fair work.

Concrete Sustainability Council·clause S1.05·p.51

The publisher’s words

CSC Technical Manual (Slag Grinding) clause S1.05 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
1. Concrete: Evidence of the measures taken, e.g. photos. Cement, aggregates: Evidence of the measures taken, e.g. monitoring protocols or photos OR A management declaration, if no blasting is done
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How to read this clause

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
Required?
Yes, from Gold up — below Gold it earns points
Topic
Social Health & Equity — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Level
Gold — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Slag Grinding) · version v3.0 · clause S1.05 · page 51 · build 2026-10-16-0230 · https://klarcite.com/r/3f29dc41815c2a4b

Source document

Record details

Page 51. Read in build 2026-10-16-0230, harvested 2026-10-16.

uid 3f29dc41815c2a4b · document 137925db5c270170 · fidelity verbatim · published 2025-12-01

Other clauses in this standard