ICA responsibilities for building systems

Klar Cite’s name
Mandatory

Required: must be met for the credential.

Guidance

This is guidance, not a requirement. Green Star Buildings Submission Guidelines restates what Green Star’s standard requires; the register holds it and cites it, and does not count it as a requirement or show it as one.

Green Star·clause 3.17·p.55

Level
Credit Achievement

Original wording

Green Star Buildings Submission Guidelines clause 3.17 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: ICA oversight during building phases

written by a model, checked against the clause

Read it at the source

Details

How it is proven

Who checks it
Applicant declares — a signed statement from the applicant

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
Standing
Required — must be met for the credential
Level
Credit Achievement — the level of the credential this clause belongs to

Cite this clause

Green Star · Green Star Buildings Submission Guidelines · version v1.1 Rev A · clause 3.17 · page 55 · build 2026-10-27-1239 · https://klarcite.com/r/14925a239dfdf5e8

Source document

Record details

Page 55. Read in build 2026-10-27-1239, harvested 2026-10-27.

uid 14925a239dfdf5e8 · document b6cffefd9806e9f5 · fidelity verbatim · published 2025-10