Visual impact limit for populated areas

Mandatory

Required: must be met for the credential.

GECA·clause EV-5.8·p.45

Limit
≤ 30 score

Original wording

The publisher lets each reader see 7 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

Details

What the product must meet

Limits held for this clause

Parameter / contextOperatorLimitUnit
grade or score≤30score

Compare this limit across schemes

The limit was read from the clause wording and checked by a reader.

Applies to
Where the mine or quarry is located within 5 km of a populated area

How it is proven

Evidence required
Documentation and calculations showing that criterion is not applicable; OR DoC EV-5.8.2: Calculation of the visual impact of mines and quarries using Appendix D.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

Klar Cite’s reading

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
Standing
Required — must be met for the credential
Topic
Social Health & Equity — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Refers to
Appendix D — places elsewhere in the document

Cite this clause

GECA · Hard Surfacing · version HS Gen 3.0 · clause EV-5.8 · page 45 · build 2026-10-22-0117 · https://klarcite.com/r/07bfcbf132275302

Source document

Record details

Page 45, EV-5.8 VISUAL IMPACT. Read in build 2026-10-22-0117, harvested 2026-10-22.

uid 07bfcbf132275302 · document bfb6399c60352ae9 · fidelity verbatim · published 2026-06