Ratings & Policy

Find where a product credential earns points or counts, and what each rating tool or policy accepts.

Pick any rating tools or policies and any credentials. The results narrow to what you pick.

3 credentials, in LEED v5 ID+C and BREEAM International NC v7.1. Clear selection

EPD Australasia

Where it earns points or counts, rating tool by rating tool. About EPD Australasia

Credit names, credential names and conditions are in each rating tool's or policy's own words, shown where its publisher's terms allow.

LEED v5 ID+CRating tool

  • MRc4(credit title not shown under U.S. Green Building Council, Inc.'s terms)

    Status
    Accepted as an ISO 14025 Type III EPD programme (own statement)
    Named as
    EPD Australasia
    Edition named
    Not stated by the tool
    Level
    • Product-specific Type III: 1
    • Optimised (over 20% lower GWP): 3
    • Optimised (over 40% lower GWP, over 10% lower in three more categories): 5
    · LEED multi-attribute score (max 5)
    Draws on
    Climate Health, Ecosystem Health
    On what basis
    the combined score Table 1 prints for the document; a product takes the highest score in each criteria area, and areas add up to at most 5; “+” and “up to” mean recycled or biobased content can add to it
    Products
    any MRc4 ID+C product category
    Scope
    Not shown under U.S. Green Building Council, Inc.'s terms
    The rule
    Not shown under U.S. Green Building Council, Inc.'s terms
    Source
    LEED v5 ID+C · MRc4 · p. 5

BREEAM International NC v7.1Rating tool

  • Mat 02 Environmental product declarations, Table 74 Validity

    Status
    Accepted as an ISO 14025 Type III EPD programme (own statement)
    Named as
    EPD Australasia
    Edition named
    Not stated by the tool
    Level
    0.5 (EPD for more than one product in the same product category, more than one manufacturer) / 0.75 (more than one product, single manufacturer) / 1.5 (single product or colour/pattern variations, single manufacturer) · EPD points
    On what basis
    Per EPD, by EPD type (0.5 / 0.75 / 1.5, see EPD rows)
    Products
    Construction products
    The rule
    • EPD unexpired at the point of specification
    • Product installed in the building by the end of construction
    • For products under the Construction Product Regulations: product category rules based on BS EN 15804
    • EPD not pending verification at the time of specification (CN2)
    Source
    BREEAM International NC v7.1 · Mat 02 · p. 304

Read EPD Australasia’s requirements →

Global Responsible Textile Standard

Where it earns points or counts, rating tool by rating tool. About Global Responsible Textile Standard

Credit names, credential names and conditions are in each rating tool's or policy's own words, shown where its publisher's terms allow.

None of the rating tools or policies selected names Global Responsible Textile Standard. That is not a statement that none accepts it.

Read Global Responsible Textile Standard’s requirements →

Steel Sustainability Australia

Where it earns points or counts, rating tool by rating tool. About Steel Sustainability Australia

Credit names, credential names and conditions are in each rating tool's or policy's own words, shown where its publisher's terms allow.

None of the rating tools or policies selected names Steel Sustainability Australia. That is not a statement that none accepts it.

Read Steel Sustainability Australia’s requirements →