The document this clause was read from is superseded. It is kept so older citations resolve.
Transport management system
Klar Cite summary
The site must have transport management system in place. It is needed for the silver level. Evidence the scheme asks for: extract of the transportation management system. This is possibly linked to climate.
Concrete Sustainability Council·clause E8.02·p.44
The publisher’s words
CSC Technical Manual (Marine Aggregates) clause E8.02 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Extract of the transportation management system (or logistical disposition system) showing that it contains the required items.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How to read this clause
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Have a system in place — e.g. a management system, a procedure or a take-back scheme
- Required?
- Yes, from Silver up — below Silver it earns points
- Topic
- Climate Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
- Level
- Silver — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Marine Aggregates) · version v2.1 · clause E8.02 · page 44 · build 2026-10-16-0230 · https://klarcite.com/r/f8a8ad59161c6ad5
Record details
Page 44, E8 - Transport. Read in build 2026-10-16-0230, harvested 2026-10-16.
uid f8a8ad59161c6ad5 · document ad78a1b6084a2cca · fidelity verbatim · published 2022-10-21