Responsible land use

Klar Cite summary

This clause concerns responsible land use. It is needed for the silver level. Evidence the scheme asks for: concrete: Site layout. This concerns ecosystems and nature.

Concrete Sustainability Council·clause E2.02·p.91

The publisher’s words

CSC Technical Manual clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
1. Concrete: Site layout showing the locations of the main plant installations including roadways, stormwater drains, retention basins, etc. The layout plan includes an explanation as to why/how the site layout enables using the land in a particularly efficient way (e.g. biodiversity, efficient traffic flow, stormwater management, efficient storage / processing of materials).
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How to read this clause

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Have a system in place — e.g. a management system, a procedure or a take-back scheme
Required?
Yes, from Silver up — below Silver it earns points
Topic
Ecosystem Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Level
Silver — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual · version v3.0 · clause E2.02 · page 91 · build 2026-10-16-0230 · https://klarcite.com/r/ec9bd729924c54ab

Source document

Record details

Page 91, E2 - Land Use. Read in build 2026-10-16-0230, harvested 2026-10-16.

uid ec9bd729924c54ab · document 9459685e7c45ce1c · published 2025-12-01