The document this clause was read from is superseded. It is kept so older citations resolve.

Risk analysis at least every two years

Klar Cite summary

This clause concerns risk analysis at least every two years. It is needed for the silver level. Evidence the scheme asks for: evidence of the analysis - not older than two years at the moment of certification. An independent assessor checks it. This concerns people and fair work.

Concrete Sustainability Council·clause S3.01·p.51

The publisher’s words

CSC Technical Manual (Marine Aggregates) clause S3.01 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Evidence of the analysis - not older than two years at the moment of certification (e.g. by providing exemplary documents covering plants within the scope of certification).
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How to read this clause

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Check suppliers or materials — verify suppliers, documents or substances against a list or rule
Required?
Yes, from Silver up — below Silver it earns points
Topic
Social Health & Equity — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Level
Silver — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Marine Aggregates) · version v2.1 · clause S3.01 · page 51 · build 2026-10-16-0230 · https://klarcite.com/r/d5463f695322dc64

Source document

Record details

Page 51, S3 - Occupational Health & Safety. Read in build 2026-10-16-0230, harvested 2026-10-16.

uid d5463f695322dc64 · document ad78a1b6084a2cca · fidelity verbatim · published 2022-10-21

Other clauses in this standard