Responsible land use

Klar Cite summary

This clause concerns responsible land use. It is needed for the silver level. It applies to aggregate. Evidence the scheme asks for: an extraction management plan is in place for all dredging sites, which include caution for important sites and neighbouring projects. This concerns ecosystems and nature.

Concrete Sustainability Council·clause E2.02·p.30

The publisher’s words

CSC Technical Manual (Marine Aggregates) clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
Aggregate

How it is proven

Evidence required
1. An extraction management plan is in place for all dredging sites, which include caution for important (nature) sites and neighbouring projects.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How to read this clause

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Have a system in place — e.g. a management system, a procedure or a take-back scheme
Required?
Yes, from Silver up — below Silver it earns points
Topic
Ecosystem Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Level
Silver — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Marine Aggregates) · version v3.0 · clause E2.02 · page 30 · build 2026-10-16-0230 · https://klarcite.com/r/c6b7938d8e1ed12b

Source document

Record details

Page 30. Read in build 2026-10-16-0230, harvested 2026-10-16.

uid c6b7938d8e1ed12b · document 5845577c133dc494 · published 2026-06-10

Other clauses in this standard