Water Policy
Klar Cite summary
The company must have water policy in place. It is needed for the platinum level. It applies to aggregate. Evidence the scheme asks for: copy of the publicly available policy. This concerns ecosystems and nature.
Concrete Sustainability Council·clause E5.01·p.37
The publisher’s words
CSC Technical Manual (Marine Aggregates) clause E5.01 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- Aggregate
How it is proven
- Evidence required
- 1. Copy of the publicly available policy.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How to read this clause
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Have a system in place — e.g. a management system, a procedure or a take-back scheme
- Required?
- Yes, at Platinum — below Platinum it earns points
- Topic
- Ecosystem Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
- Level
- Platinum — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Marine Aggregates) · version v3.0 · clause E5.01 · page 37 · build 2026-10-16-0230 · https://klarcite.com/r/a1cf0196fe64d3a7
Record details
Page 37. Read in build 2026-10-16-0230, harvested 2026-10-16.
uid a1cf0196fe64d3a7 · document 5845577c133dc494 · fidelity verbatim · published 2026-06-10
Other clauses in this standard
| Clause | Name |
|---|---|
| B1.01 | Local Economy |
| B2.01 | Ethical risk assessment |
| B2.02 | Policy or code for ethical business |
| B2.03 | Confidential investigation |
| B2.04 | Responsible political involvement |
| B2.05 | Respect for property rights |