Risk analysis for OHS
Klar Cite summary
This clause concerns risk analysis for OHS. It is needed for the silver level. Evidence the scheme asks for: evidence of the analysis; not older than two years at the moment of certification = 1 point. An independent assessor checks it. This concerns people and fair work.
Concrete Sustainability Council·clause S3.01·p.58
The publisher’s words
CSC Technical Manual (Precast Concrete without own fresh concrete production) clause S3.01 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- 1. Evidence of the analysis not older than two years at the moment of certification (e.g. by providing exemplary documents covering plants within the scope of certification) = 1 point. not older than one year at the moment of certification = 2 points.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How to read this clause
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Check suppliers or materials — verify suppliers, documents or substances against a list or rule
- Required?
- Yes, from Silver up — below Silver it earns points
- Topic
- Social Health & Equity — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
- Level
- Silver — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Precast Concrete without own fresh concrete production) · version v3.0 · clause S3.01 · page 58 · build 2026-10-16-0230 · https://klarcite.com/r/9427b35c07bf22c1
Record details
Page 58. Read in build 2026-10-16-0230, harvested 2026-10-16.
uid 9427b35c07bf22c1 · document 4268d5ebebcf9b5d · fidelity verbatim · published 2025-12-01
Other clauses in this standard
| Clause | Name |
|---|---|
| B1.01 | Local Economy |
| B2.01 | Ethical risk assessment |
| B2.02 | Policy or code for ethical business |
| B2.03 | Confidential investigation |
| B2.04 | Responsible political involvement |
| B2.05 | Respect for property rights |