The document this clause was read from is superseded. It is kept so older citations resolve.

Responsible land use

Klar Cite summary

This clause concerns responsible land use. It is needed for the silver level. Evidence the scheme asks for: an extraction management plan is in place for all dredging sites, which include caution for important sites and neighbouring projects. This concerns ecosystems and nature.

Concrete Sustainability Council·clause E2.02·p.28

The publisher’s words

CSC Technical Manual (Marine Aggregates) clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
An extraction management plan is in place for all dredging sites, which include caution for important (nature) sites and neighbouring projects.
Who checks it
Applicant declares — a signed statement from the applicant

How to read this clause

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Have a system in place — e.g. a management system, a procedure or a take-back scheme
Required?
Yes, from Silver up — below Silver it earns points
Topic
Ecosystem Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Level
Silver — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Marine Aggregates) · version v2.1 · clause E2.02 · page 28 · build 2026-10-16-0230 · https://klarcite.com/r/7d38a86d1905ed73

Source document

Record details

Page 28. Read in build 2026-10-16-0230, harvested 2026-10-16.

uid 7d38a86d1905ed73 · document ad78a1b6084a2cca · fidelity verbatim · published 2022-10-21

Other clauses in this standard