The document this clause was read from is superseded. It is kept so older citations resolve.
No Lost Time Injuries in last three years
Klar Cite summary
This clause concerns lost time injury record of the plant. Optional; earns points. This concerns people and fair work.
Concrete Sustainability Council·clause S3.11·p.48
The publisher’s words
CSC Technical Manual (Recycled Aggregates) clause S3.11 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- Aggregate: 2 points.
How it is proven
- Who checks it
- Applicant declares — a signed statement from the applicant
How to read this clause
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
- Required?
- Optional, earns points — not required; meeting it adds to the score
- Topic
- Social Health & Equity — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Recycled Aggregates) · version v2.1 · clause S3.11 · page 48 · build 2026-10-16-0230 · https://klarcite.com/r/3580f57f26d6fc3e
Record details
Page 48, S3.11 No Lost Time Injuries (LTI) during the last three years. Read in build 2026-10-16-0230, harvested 2026-10-16.
uid 3580f57f26d6fc3e · document b101af454a6b608a · fidelity verbatim · published 2022-10-21