Biodiversity management/action plan

Klar Cite summary

The site must have biodiversity management/action plan in place. It is needed for the silver level. Evidence the scheme asks for: a copy of the BMP; BAP. This concerns ecosystems and nature.

Concrete Sustainability Council·clause E6.05·p.42

The publisher’s words

CSC Technical Manual (Marine Aggregates) clause E6.05 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
A copy of the BMP or BAP.
Who checks it
Applicant declares — a signed statement from the applicant

How to read this clause

Klar Cite’s reading of the clause, not the scheme’s own claim.

Type of requirement
Have a system in place — e.g. a management system, a procedure or a take-back scheme
Required?
Yes, from Silver up — below Silver it earns points
Topic
Ecosystem Health — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
Level
Silver — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Marine Aggregates) · version v2.1 · clause E6.05 · page 42 · build 2026-10-16-0230 · https://klarcite.com/r/305054304dbb9a79

Source document

Record details

Page 42. Read in build 2026-10-16-0230, harvested 2026-10-16.

uid 305054304dbb9a79 · document ad78a1b6084a2cca · fidelity verbatim · published 2022-10-21

Other clauses in this standard