Implementation of noise/vibration management plan
Klar Cite summary
This clause concerns implementation of noise/vibration management plan. It is needed for the gold level. Evidence the scheme asks for: concrete: Evidence of the measures taken, e.g. photos. This is possibly linked to people and fair work.
Concrete Sustainability Council·clause S1.05·p.55
The publisher’s words
CSC Technical Manual (Cement Grinding and Blending) clause S1.05 — words not shown. Read it at the source. The publisher reserves the right to its wording, so it is not republished here. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Concrete: Evidence of the measures taken, e.g. photos. Cement, aggregates: Evidence of the measures taken, e.g. monitoring protocols or photos OR A management declaration, if no blasting is done.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How to read this clause
Klar Cite’s reading of the clause, not the scheme’s own claim.
- Type of requirement
- Meet a limit or condition — e.g. a maximum emission or a minimum recycled content
- Required?
- Yes, from Gold up — below Gold it earns points
- Topic
- Social Health & Equity — the topic the clause addresses, grouped by the Common Materials Framework (CMF)
- Level
- Gold — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Cement Grinding and Blending) · version v3.0 · clause S1.05 · page 55 · build 2026-10-16-0230 · https://klarcite.com/r/301d4b193e6b9808
Record details
Page 55. Read in build 2026-10-16-0230, harvested 2026-10-16.
uid 301d4b193e6b9808 · document 581191875b1cba6a · fidelity verbatim · published 2025-12-01