Corrective actions based upon incidents
Concrete Sustainability Council·clause S3.09·p.63
The requirement
CSC Technical Manual (Precast Concrete with own fresh concrete production) clause S3.09 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- Concrete
How it is proven
- Evidence required
- Documentation of the analysis and corrective actions, where applicable, taken after an incident
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Social Health & Equity — the CMF area the clause addresses
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Precast Concrete with own fresh concrete production) · version v3.0 · clause S3.09 · page 63 · build 2026-10-05-0439 · https://klarcite.com/r/f0332dfbfd09c028
Record details
Page 63, S3.09 Corrective actions based upon incidents. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid f0332dfbfd09c028 · document 7156fa3745c18186 · fidelity verbatim · published 2025-07-01
Other clauses in this standard
| Clause | Name |
|---|---|
| B1.01 | Local Economy |
| B2.01 | Ethical risk assessment |
| B2.02 | Policy or code for ethical business |
| B2.03 | Confidential investigation |
| B2.04 | Responsible political involvement |
| B2.05 | Respect for property rights |