Confidential investigation

Concrete Sustainability Council·clause B2.03·p.73

The requirement

CSC Technical Manual (Precast Concrete with own fresh concrete production) clause B2.03 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
Concrete

How it is proven

Evidence required
Evidence that a mechanism for confidential investigation (on company level) is in place. E.g.: A company hotline or publicly available telephone number to submit a complaint.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Level
Bronze — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Precast Concrete with own fresh concrete production) · version v3.0 · clause B2.03 · page 73 · build 2026-10-05-0439 · https://klarcite.com/r/6a9391e299051431

Source document

Record details

Page 73, B2.03 Confidential investigation. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 6a9391e299051431 · document 7156fa3745c18186 · fidelity verbatim · published 2025-07-01

Other clauses in this standard