Corrective actions based upon incidents for occupational health and safety

Concrete Sustainability Council·clause S3.09·p.63

The requirement

CSC Technical Manual (Precast Concrete with own fresh concrete production) clause S3.09 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Documentation of the analysis and corrective actions, where applicable, taken after an incident.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Social Health & Equity — the CMF area the clause addresses
Level
Bronze — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Precast Concrete with own fresh concrete production) · version v3.0 · clause S3.09 · page 63 · build 2026-10-05-0439 · https://klarcite.com/r/a8be4a24f3a7a321

Source document

Record details

Page 63. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid a8be4a24f3a7a321 · document 7156fa3745c18186 · fidelity verbatim · published 2025-07-01

Other clauses in this standard