Work-life balance

Concrete Sustainability Council·clause S4.08·p.69

The requirement

CSC Technical Manual (Precast Concrete with own fresh concrete production) clause S4.08 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
Concrete

How it is proven

Evidence required
Evidence that choices in work-life balance are possible, such as evidence of facilities, voluntary contractual agreements OR Evidence (e.g. exemplary time sheets), that working hours comply with contract or locals laws OR Reference to local law (where applicable).
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Social Health & Equity — the CMF area the clause addresses
Level
Bronze — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Precast Concrete with own fresh concrete production) · version v3.0 · clause S4.08 · page 69 · build 2026-10-05-0439 · https://klarcite.com/r/a6b770849bc1c622

Source document

Record details

Page 69, S4.08 Work-life balance. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid a6b770849bc1c622 · document 7156fa3745c18186 · fidelity verbatim · published 2025-07-01

Other clauses in this standard