Water Policy
Concrete Sustainability Council·clause E5.01·p.37
The requirement
CSC Technical Manual (Precast Concrete with own fresh concrete production) clause E5.01 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- 1. Copy of the publicly available policy.
- Who checks it
- Applicant declares — a signed statement from the applicant
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Precast Concrete with own fresh concrete production) · version v3.0 · clause E5.01 · page 37 · build 2026-10-05-0439 · https://klarcite.com/r/9a27596fb2b1031f
Record details
Page 37. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 9a27596fb2b1031f · document 7156fa3745c18186 · fidelity verbatim · published 2025-07-01
Other clauses in this standard
| Clause | Name |
|---|---|
| B1.01 | Local Economy |
| B2.01 | Ethical risk assessment |
| B2.02 | Policy or code for ethical business |
| B2.03 | Confidential investigation |
| B2.04 | Responsible political involvement |
| B2.05 | Respect for property rights |