Energy transition pathway submission

Blue Angel·clause 3.3.2·pp.18-19

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
The applicant shall declare compliance with the requirements in Annex 1, state the proportion of renewable energies in the process energy in the production stage in Annex 1-P and submit a document with the description of their energy transition pathway. If the EPD is not yet available when the application is submitted, the proportion of renewable energies is submitted at a later time together with the EPD as soon as it is available, without being asked to do so.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

Blue Angel · DE-UZ 132 Low Emission Thermal Insulation · version DE-UZ 132 · clause 3.3.2 · page 18-19 · build 2026-10-05-0439 · https://klarcite.com/r/7efbef0334996bb2

Source document

Record details

Page 18-19. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 7efbef0334996bb2 · document 3d7e13fc3f89d869 · fidelity close quote · published 2026-07