Implementation of noise/vibration management plan
Concrete Sustainability Council·clause S1.05·p.53
The requirement
CSC Technical Manual (Precast Concrete with own fresh concrete production) clause S1.05 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Concrete: Evidence of the measures taken, e.g. photos. Cement, aggregates: Evidence of the measures taken, e.g. monitoring protocols or photos OR A management declaration, if no blasting is done
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Social Health & Equity — the CMF area the clause addresses
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Precast Concrete with own fresh concrete production) · version v3.0 · clause S1.05 · page 53 · build 2026-10-05-0439 · https://klarcite.com/r/7c68704ea516b41a
Record details
Page 53. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 7c68704ea516b41a · document 7156fa3745c18186 · published 2025-07-01
Other clauses in this standard
| Clause | Name |
|---|---|
| B1.01 | Local Economy |
| B2.01 | Ethical risk assessment |
| B2.02 | Policy or code for ethical business |
| B2.03 | Confidential investigation |
| B2.04 | Responsible political involvement |
| B2.05 | Respect for property rights |