Noise level preliminary screening
BREEAM·clause Apreliminary noise screening·p.421
The requirement
BREEAM International New Construction Technical Manual clause Apreliminary noise screening — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Exemptions
- Where the assessed area is not intended to be occupied, or where no plant or equipment capable of generating noise is present or specified, the requirements of this issue do not apply.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Screen — a check against a list or a criterion before anything else applies
- Standing
- Required — must be met for the credential
- Impact area
- Social Health & Equity — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause Apreliminary noise screening · page 421 · build 2026-10-05-0439 · https://klarcite.com/r/f5e9bd341ac542d2
Record details
Page 421, BREEAM NEW CONSTRUCTION POL 05 REDUCTION OF NOISE POLLUTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid f5e9bd341ac542d2 · document e3e19e8b697bf44b · fidelity close quote · published 2024