The document this clause was read from is superseded. It is kept so older citations resolve.
Compliance with external facilities in existing buildings
BREEAM·clause CN3 Extensions to existing buildings·p.323
The requirement
BREEAM International New Construction Technical Manual clause CN3 Extensions to existing buildings — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- non-residential buildings and residential institutions
How it is proven
- Evidence required
- Design drawings or relevant section or clauses of the building specification confirming provision and scope of dedicated facilities (on site and off-site). Project team meeting minutes or a letter confirming likely building waste streams and indicative volumes. BREEAM Assessor's site inspection report and photographic evidence.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN3 Extensions to existing buildings · page 323 · build 2026-10-05-0439 · https://klarcite.com/r/f20b74f2a0e2835e
Record details
Page 323, Wst 03b Operational waste (residential only). Read in build 2026-10-05-0439, harvested 2026-10-05.
uid f20b74f2a0e2835e · document c79f01533227ee10 · fidelity verbatim · published 2016