Interim design stage documentation
BREEAM·clause ENE-05·p.208
The requirement
BREEAM International New Construction Technical Manual clause ENE-05 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- (all buildings)
How it is proven
- Evidence required
- Design drawings, building specifications, equipment schedules, calculations.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause ENE-05 · page 208 · build 2026-10-05-0439 · https://klarcite.com/r/ef020f1c802166da
Record details
Page 208, ENE 05 ENERGY EFFICIENT EQUIPMENT BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid ef020f1c802166da · document e3e19e8b697bf44b · fidelity close quote · published 2024