Ground level and access design for flood resilience
BREEAM·clause 4a·p.403
The requirement
BREEAM International New Construction Technical Manual clause 4a — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| length | ≥ | 600 | mm |
Compare this limit across schemes
The limit was read from the clause wording.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause 4a · page 403 · build 2026-10-05-0439 · https://klarcite.com/r/ecb1da3b621e8d59
Record details
Page 403, BREEAM NEW CONSTRUCTION POL 03 FLOOD AND SURFACE WATER MANAGEMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid ecb1da3b621e8d59 · document e3e19e8b697bf44b · fidelity verbatim · published 2024