Applicability of Glare Control - Atrium Spaces
BREEAM·clause HEA 01 M2.3·p.95
The requirement
BREEAM International New Construction Technical Manual clause HEA 01 M2.3 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Exemptions
- Where an atrium space does not meet the definition of ‘relevant building areas — glare control it does not need to comply with the criteria.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause HEA 01 M2.3 · page 95 · build 2026-10-05-0439 · https://klarcite.com/r/ec66bdc6ee779edc
Record details
Page 95, HEA 01 NATURAL LIGHT BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid ec66bdc6ee779edc · document e3e19e8b697bf44b · fidelity verbatim · published 2024