Final design reflecting flood risk recommendations
BREEAM·clause 4b·p.403
The requirement
BREEAM International New Construction Technical Manual clause 4b — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause 4b · page 403 · build 2026-10-05-0439 · https://klarcite.com/r/eb24b9084962b8d7
Record details
Page 403, BREEAM NEW CONSTRUCTION POL 03 FLOOD AND SURFACE WATER MANAGEMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid eb24b9084962b8d7 · document e3e19e8b697bf44b · fidelity verbatim · published 2024