Final design reflecting flood risk recommendations

BREEAM·clause 4b·p.403

The requirement

BREEAM International New Construction Technical Manual clause 4b — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause 4b · page 403 · build 2026-10-05-0439 · https://klarcite.com/r/eb24b9084962b8d7

Source document

Record details

Page 403, BREEAM NEW CONSTRUCTION POL 03 FLOOD AND SURFACE WATER MANAGEMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid eb24b9084962b8d7 · document e3e19e8b697bf44b · fidelity verbatim · published 2024