Energy centre or other LZCs connected later
BREEAM·clause CN4.5 ×C feasibility study - Energy centre or other ×Cs connected at alater stage·p.182
The requirement
BREEAM International New Construction Technical Manual clause CN4.5 ×C feasibility study - Energy centre or other ×Cs connected at alater stage — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and located; only its shape defeated the harvest.
What the product must meet
- Applies to
- (all buildings)
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN4.5 ×C feasibility study - Energy centre or other ×Cs connected at alater stage · page 182 · build 2026-10-05-0439 · https://klarcite.com/r/e9dbcb334282e2d1
Record details
Page 182, Ene 04 Low carbon design. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid e9dbcb334282e2d1 · document c79f01533227ee10 · fidelity close quote · published 2016