The document this clause was read from is superseded. It is kept so older citations resolve.

Energy centre or other LZCs connected later

BREEAM·clause CN4.5 ×C feasibility study - Energy centre or other ×Cs connected at alater stage·p.182

The requirement

BREEAM International New Construction Technical Manual clause CN4.5 ×C feasibility study - Energy centre or other ×Cs connected at alater stage — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and located; only its shape defeated the harvest.

Read it at the source

What the product must meet

Applies to
(all buildings)

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause CN4.5 ×C feasibility study - Energy centre or other ×Cs connected at alater stage · page 182 · build 2026-10-05-0439 · https://klarcite.com/r/e9dbcb334282e2d1

Source document

Record details

Page 182, Ene 04 Low carbon design. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid e9dbcb334282e2d1 · document c79f01533227ee10 · fidelity close quote · published 2016