BREEAM AP - Monitoring progress
BREEAM·clause Man 01 Project brief and design·p.39
The requirement
BREEAM International New Construction Technical Manual clause Man 01 Project brief and design — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- (all buildings)
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause Man 01 Project brief and design · page 39 · build 2026-10-05-0439 · https://klarcite.com/r/e7e8e1c45a08c94f
Record details
Page 39, MAN 01 PROJECT BRIEF AND DESIGN. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid e7e8e1c45a08c94f · document e3e19e8b697bf44b · fidelity close quote · published 2024