Waste processing facility compliance

GECA·clause EV-6.3.4·p.35

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
DoC EV-6.3.4: The waste processing facility used by the demolition waste generator should comply with Waste Procession Facilities Criteria 1, 2 and 3 of Green Star Waste Construction and Demolition Reporting Criteria.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Template — boilerplate text the document carries
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

GECA · Construction & Demolition Waste Services · version CDWS Gen 3.0 · clause EV-6.3.4 · page 35 · build 2026-10-05-0439 · https://klarcite.com/r/e42e7a09ad5c2b5d

Source document

Record details

Page 35, EV-6.3 DEMONSTRATED WASTE DIVERSION. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid e42e7a09ad5c2b5d · document 64328b61121907c8 · fidelity verbatim · published 2026-06

Other clauses in this standard