Waste processing facility compliance
GECA·clause EV-6.3.4·p.35
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 3 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- DoC EV-6.3.4: The waste processing facility used by the demolition waste generator should comply with Waste Procession Facilities Criteria 1, 2 and 3 of Green Star Waste Construction and Demolition Reporting Criteria.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Template — boilerplate text the document carries
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
GECA · Construction & Demolition Waste Services · version CDWS Gen 3.0 · clause EV-6.3.4 · page 35 · build 2026-10-05-0439 · https://klarcite.com/r/e42e7a09ad5c2b5d
Record details
Page 35, EV-6.3 DEMONSTRATED WASTE DIVERSION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid e42e7a09ad5c2b5d · document 64328b61121907c8 · fidelity verbatim · published 2026-06