Provide project-specific collection plan for C&D waste

GECA·clause EV-4.1·p.29

The requirement

The publisher’s words are shown on request, below the limits.

What the product must meet

Limits held for this clause

Parameter / contextOperatorLimitUnit
share≥90%

Compare this limit across schemes

The limit was read from the clause wording.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Document Conformance with these requirements shall be stated in writing and signed by the Chief Executive Officer or other authorised representative of the applicant company. This statement shall be supported by: DoC EV-4.1.1:
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

GECA · Construction & Demolition Waste Services · version CDWS Gen 3.0 · clause EV-4.1 · page 29 · build 2026-10-05-0439 · https://klarcite.com/r/720affa1dbba8725

Source document

Record details

Page 29, EV-4.1 PLANNING. Read in build 2026-10-05-0439, harvested 2026-10-05.