Provide project-specific collection plan for C&D waste
GECA·clause EV-4.1·p.29
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 90 | % |
Compare this limit across schemes
The limit was read from the clause wording.
The publisher’s words
The publisher lets each reader see 3 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- Document Conformance with these requirements shall be stated in writing and signed by the Chief Executive Officer or other authorised representative of the applicant company. This statement shall be supported by: DoC EV-4.1.1:
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
GECA · Construction & Demolition Waste Services · version CDWS Gen 3.0 · clause EV-4.1 · page 29 · build 2026-10-05-0439 · https://klarcite.com/r/720affa1dbba8725
Record details
Page 29, EV-4.1 PLANNING. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 720affa1dbba8725 · document 64328b61121907c8 · fidelity verbatim · published 2026-06